Before digging out the new orchestra pit, the contractor made some preparations. In the top photo, chemical grouting equipment can be seen in the background, injecting a compound into the soil under the theater walls to solidify it. In the bottom photo, the steel plates in the foreground conceal a new sump pump installed to keep the excavation area (and the orchestra pit when completed) dry.
Monday, August 20, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment