Monday, August 20, 2007

Pit Preparation

Before digging out the new orchestra pit, the contractor made some preparations. In the top photo, chemical grouting equipment can be seen in the background, injecting a compound into the soil under the theater walls to solidify it. In the bottom photo, the steel plates in the foreground conceal a new sump pump installed to keep the excavation area (and the orchestra pit when completed) dry.



No comments: