Tuesday, April 29, 2008
Monday, April 28, 2008
Decorative Painters Transform the Theater
The organ lofts on the side of the theater with a coat of base paint awaiting the decorative painting team.
Work begins at creating the impression of travertine blocks on the theater wall.
Some base layers of color are put on the wall.
Two teams work across the wall darkening the faux stone.
Work begins at creating the impression of travertine blocks on the theater wall.
Some base layers of color are put on the wall.
Two teams work across the wall darkening the faux stone.
Sunday, April 27, 2008
William G. Selby and Marie Selby Foundation Lobby
Trim work in the new William G. Selby and Marie Selby Foundation Lobby.
Electricians and decorative artists working side by side.
Saturday, April 26, 2008
Stage Finishing
The new wood floor is laid on the stage.
The stage floor is ready for painting, as are the columns on either side of the stage.
Friday, April 25, 2008
Decorative Painting - Video
Thursday, April 24, 2008
Wednesday, April 23, 2008
Construction Tours
Gabe Schmergel, Stan and Alma Abshier, and Valerie Schmergel after completing a tour of the Opera House.
Jack and Isabel Wright heading out for a tour.
Ken Kwiatkowski takes a break on a tour.
Susan Danis gives a tour of the renovated theater to incoming singers from the Apprentice and Studio Artists Programs.
Tuesday, April 22, 2008
Orchestra Pit Lift Finishing
The steel structure for the Pit lift 'car' or platform is loaded into the pit, then assembled by the crew from Gala systems.
A wood deck is built on top of the lift car.
The pit lift at its lowest position, creating a full sized orchestra pit which extends under the stage.
The entire orchestra pit lift car, as seen from the lighting positions in the ceiling of the auditorium.
see some earlier photos of the pit lift construction.